About Us

Who We Are

EGP Smart Energy is a premier provider of Electrical Infrastructure Solutions for the Transmission and Distribution industry. With more than a decade of proven expertise across EHV, HV, and MV systems, we deliver dependable, future-ready grid infrastructure worldwide — engineered with precision, executed with agility, and tailored to each customer's vision.

EHV Capabilities

Extra High Voltage

Proven delivery of EHV substations and transformers — from 230kV through 400kV — engineered for utility-grade reliability and long service life.

Large indoor 400kV Gas Insulated Switchgear installation with blue metal components.

400kV GIS

230kV GIS installation inside a large industrial building.

230kV GIS

HV Capabilities

High Voltage

Substation packages and HT transformers at 66kV — supplied, installed, tested, and commissioned to stringent grid and industrial specifications.

Row of 66kV Gas Insulated Switchgear inside a substation building with control panels.

66kV GIS

MV Capabilities

Medium Voltage

Eco-friendly ester-oil distribution transformers, 22kV ring-main units, 38kV GIS, and complementary cable systems for modern distribution networks.

Row of green industrial transformers with metal floor grates.

22kV Ester Oil Transformers

Electrical equipment in a substation room.

Substation Equipment

Our Journey

Milestones

Decades of breakthroughs across Singapore, China, India, and the wider region.

  1. 1992

    Mr Frankie Fan began his electrical engineering career in Singapore by setting up Tong Guan Resources.

  2. 1998

    Secured the first 230kV GIS Substation Project in Singapore.

  3. 2004

    Secured Singapore's highest voltage 400kV GIS Substation Project.

  4. 2006

    Secured Singapore's biggest 230kV Shunt Reactor capacity project.

  5. 2008

    EGP Smart Energy incorporated to expand into new markets like Renewables and Sustainable Power Solutions, integrating with the Transmission & Distribution sector.

  6. 2010

    Secured the first 230kV GIS Substation integration of 2 different OEM brand interfaces.

  7. 2010–2018

    Business expansion into the India market with Transmission Projects up to 765kV.

  8. 2013

    Secured Partial Discharge Monitoring (Online) for China National Grid 1,100kV — the world's highest grid rating.

  9. 2015

    Secured one of the largest Double Bus-Bar 230kV GIS Substation Projects.

  10. 2017

    Secured the largest Power Transformer Rating: 400kV, 500MVA project.

  11. 2022

    Secured the Southeast Asia BESS Project, 200MW.

  12. 2023

    Secured the first Southeast Asia large-scale underground 230kV Substation with Non-Flammable Gas Insulated Transformer.

  13. 2024

    Secured Autonomous Mobile Robot Project for Maintenance and Service.